Project Team (Gabriola)

Architect: Johnston, Davidson Architects

Mech Eng.: Flow Consulting

Supplier: Barr Plastics

Installer: Mount Benson Mechanical

Project Team (Central Saanich)

Architect: Johnston, Davidson Architects

Mech Eng.: Flow Consulting

Supplier: BARR Plastics

Installer: Kinetic Construction

Standard

SWM City Policy

BARR Product

Factory built galvanized steel tanks with epoxy lining and engineered seismic tie down systems.

The Projects

Gabriola : 4 – 3750 USG Galvanized steel epoxy lined tanks for toilets, vehicle wash and emergency water supply.

Central Saanich: 5 – 3718 USG Galvanized steel epoxy lined tanks for toilets, vehicle wash, tanker  ll and emergency supply.