• barradmin

Case Study: Fire Halls

Updated: May 27

Project Team (Gabriola)

Architect: Johnston, Davidson Architects

Mech Eng.: Flow Consulting

Supplier: Barr Plastics

Installer: Mount Benson Mechanical


Project Team (Central Saanich)

Architect: Johnston, Davidson Architects

Mech Eng.: Flow Consulting

Supplier: BARR Plastics

Installer: Kinetic Construction


Standard

SWM City Policy


BARR Product

Factory built galvanized steel tanks with epoxy lining and engineered seismic tie down systems.


The Projects

Gabriola : 4 – 3750 USG Galvanized steel epoxy lined tanks for toilets, vehicle wash and emergency water supply.

Central Saanich: 5 – 3718 USG Galvanized steel epoxy lined tanks for toilets, vehicle wash, tanker  ll and emergency supply.





 

Subscribe Form

Toll free: 1.800.665.4499

31192 S Fraser Way A, Abbotsford, BC V2T 6L5, Canada

  • Google Places
  • Facebook
  • LinkedIn
  • Twitter
  • Instagram
  • Pinterest
  • Flickr

©2020 by BARR Plastics Blog. Proudly created with Wix.com